Skip to content

Crystal bar ECAL PFA reconstruction algorithms

guofangyi@ihep.ac.cn requested to merge guofangyi/cepcsw-release:calorec into master

PFA reconstruction for the crystal bar ECAL and glass tile HCAL. Running scripts are in Reconstruction/CRDEcalRec/script/ Current BMR in ee->ZH->nunugg process: 3.8% with truth tracks, 4.2% with full reconstructed tracks. Todo:

  • Need to check the track quality before using in PFA.
  • Performance can be further optimized.

Merge request reports

Loading